The Ghana Police Service has cordoned off a construction site in East Legon following the collapse of a two storey structure. A report from Adom Online indicates that the building failed during the early hours of the morning but no immediate fatalities were recorded. Regional police officers arrived at the scene to secure the perimeter and prevent unauthorized access to the unstable debris.

According to a report by Citi Newsroom the Engineering Council of Ghana has officially joined the investigation to conduct a technical assessment of the wreckage. Preliminary findings shared by council officials suggests that the structural integrity of the building was compromised by the alleged use of inferior construction materials. Investigators are currently reviewing the building permits and architectural plans associated with the property.

The Ghana National Fire Service also provided assistance during the initial response phase to ensure no persons were trapped under the rubble. A statement from the fire service noted that the quick deployment of personnel helped stabilize the area. Officials from the Architectural and Engineering Services Limited are expected to provide a detailed report on the concrete strength and reinforcement bars used in the project.

The primary contractor for the development is currently being questioned by the police regarding compliance with National Building Regulations. A report by GhanaWeb states that the contractor may face criminal charges if the investigation proves that negligence or the deliberate use of substandard materials led to the collapse. The specific name of the contractor has not been formally released by the authorities pending further interrogation.